26 July, in Kerch at the shipyard "Zaliv" an oxygen station was put into operation. Deputy Defense Minister Yuri Borisov, Deputy Minister of Industrial Policy of the Republic of Crimea Boris Kabakov, head of the municipality of Kerch Larisa Scherbula, first deputy head of the administration of Kerch Vladimir Podlipentsev and General Director of shipbuilding plant "Zaliv" Andrei Zherdev came to cut the ribbon.

According to experts, the production of oxygen for the plant "Zaliv" is one of the most important stages of production modernization.

"Every day, about 2000 kg of oxygen consumption comes through the factory backbones, go about in gas cylinders to workshops, providing the plant with vital energy source for the process," – they explain at the plant.

Work on the restoration of workshop lasted for six months.

We bought an air separating equipment for the plant, specialists of "SpetsStroyInzheniring" performed mounting works, mounted new stationary gasifiers and cooling system.  On the territory of the workshop we covered of about 730 square meters of roof, repaired production, household and auxiliary premises.

"Starting of new objects is a guarantee that life goes on, there will be new jobs. In Crimea the level of welfare rises. Orders placed by the Ministry of Defense are serious safety cushion for the company ", - said Borisov. 

It is reported that the new plant for the production of oxygen will be able to provide the entire peninsula with gas and liquid industrial oxygen. 

Opening of oxygen station in Crimea will let to reduce costs of the peninsula

Marat Hatamtaev acting as the "Gulf" chief engineer, said that oxygen station was launched only now, because the earlier volumes of shipbuilding plant were very low. And in this case, starting of oxygen plant was highly unprofitable to plant.

And since, at the moment the level of production has increased, thereby increasing the need for oxygen. And it is now the production of our own oxygen to be justified. Until July 26, 2016 there were no any oxygen stations on the peninsula, and required liquid oxygen was purchased on the mainland of Russia, and only after that delivered to the Crimea.

Opening own oxygen plant will help to reduce the cost of the peninsula, and reduce the price of oxygen.

"Previously, we spent the money for the purchase and delivery of oxygen to the peninsula. Now, we will be able to reduce the money spent on shipping. In addition, Kerch oxygen plant will not only cover the needs of shipyard, and will cover the need for oxygen in all the Crimea ", - said Hatamtaev.

In addition, the outdoor oxygen plant can produce oxygen suitable for medical institutions that will support all medical facilities of the peninsula.

"I want to note the fact that the plant is capable of producing liquid nitrogen, which is commonly used for metal cutting in production. We also have the opportunity to fill the tanks, "- said the Acting as Chief Engineer Factory.

The total area of the plant covers 720 square meters, and the capacity is 300 kilograms per hour. During the day, the station is capable of producing 7200 kg of pure oxygen.